  1. Two ways to calculate architect fees
  2. 1. A percentage of building cost (IAI reference)
  3. 2. A per-square-metre rate
  4. What you should receive
  5. What affects the fee
  6. Tips to get the fee right
  7. Talk to Inland

Hiring an architect is often seen as an extra cost. In fact, a well-developed design prevents the biggest waste in a house project: rework halfway through, unused space, and a ballooning budget. So what is a reasonable fee?

Two ways to calculate architect fees

1. A percentage of building cost (IAI reference)

The Indonesian Institute of Architects (IAI) has a fee table that sets the architect’s fee as a percentage of total construction cost, by building category. Private houses fall into one of the categories in that table. The percentage decreases as project value rises. Examples widely quoted in the media:

Building cost Percentage (IAI table example) Approx. fee
Rp200 million ±8.00% ±Rp16 million
Rp2 billion ±6.48% ±Rp129.6 million

The table quoted by the media comes from an older edition of the IAI guidelines, so treat it as a reference, not a fixed price.

2. A per-square-metre rate

Many firms and individual architects charge per m² of floor area. National media report a wide market range — roughly Rp100,000 to Rp1 million per m² — depending on experience, design complexity, and completeness of documents. For a 150 m² house the difference can be tens of millions of rupiah, so always compare what you get, not just the number.

What you should receive

  • Concept and schematic design — floor plans, elevations, and style direction.
  • 3D visuals to see the result before building.
  • Working drawings (DED) — the details builders use on site.
  • Budget (RAB) — cost estimates per work item; see how to prepare a house RAB.
  • Permit support — technical documents for the PBG building approval.
  • Periodic supervision (if agreed) so construction follows the drawings.

A package with 3D images but no working drawings is cheaper, but often leads to mistakes on site.

What affects the fee

  1. Floor area and number of storeys — two-storey houses need more detailed structural work.
  2. Design complexity — wide spans, voids, or special facades add design time.
  3. Number of revisions — ask how many are included.
  4. Interior scope — interior design is usually priced separately.
  5. Permit and supervision needs.

Tips to get the fee right

  • Prepare a total budget and a list of room needs before meeting the architect.
  • Ask for a written scope, including revisions and drawing delivery dates.
  • Compare portfolios, not just prices — see examples of our work in the Inland project gallery.
  • Where possible, use an architect and contractor on one team so the design stays realistic for the budget.