House Construction Cost in 2026: Type 36, 45, and 70 Homes per Square Meter

Sample 2026 construction budgets for type 36, 45, and 70 homes based on per-m² market ranges in Greater Jakarta, including the cost items that are often overlooked.

Published · Tim Inland

A two-storey house under construction with brick walls
Table of Contents
  1. Construction Cost per m² in 2026
  2. Sample Budgets for Type 36, 45, and 70 Homes
  3. What Goes into the Cost
  4. Costs People Often Forget
  5. Tips to Keep Your Budget Under Control
  6. One Storey or Two: Which Is Cheaper?
  7. Stages and Duration
  8. How to Check Quality During Construction
  9. Build Your Home with Inland

Before building a house, the most important step is a realistic budget. This guide covers house construction cost per square meter in 2026 in Greater Jakarta, sample budgets for type 36, 45, and 70 homes, and the extra costs that are often missed.

Construction Cost per m² in 2026

Building class Market range per m² Typical specification
Standard IDR 3 – 4.5M Standard materials, simple finishes
Mid-range IDR 4.5 – 5.5M Mid-range materials, neater finishes
Premium IDR 6 – 7M or more Modern/custom design, premium materials

General Greater Jakarta market ranges, not an official quote. Excludes land, design fees, and permits.

Sample Budgets for Type 36, 45, and 70 Homes

In Indonesia, a house “type” refers to its floor area in m². Assuming standard to mid-range specification (IDR 3.5–5M/m²):

House type Floor area Estimated building cost
Type 36 36 m² ± IDR 126 – 180M
Type 45 45 m² ± IDR 158 – 225M
Type 70 70 m² ± IDR 245 – 350M

For a two-storey house, count the total area of both floors. A type 36 built on two floors (for example 36 m² + 36 m²) means 72 m² of floor area, with a cost per m² that tends to be higher because of the structure and staircase.

What Goes into the Cost

  1. Preparation: site clearing, setting out, batter boards, and a site office.
  2. Foundation and structure: excavation, foundations, ground beams, columns, beams, and concrete slabs—the part you should never cut corners on.
  3. Walls and roof: brick or AAC block walls, plastering and skim coat, roof structure, and roofing.
  4. Frames, doors, and windows.
  5. Floors, ceilings, and finishes: tiles, paint, sanitary ware.
  6. Electrical, clean water, and drainage installations.

Costs People Often Forget

  • Design and working drawings (architectural and structural).
  • PBG building approval and local fees.
  • Electricity and water connections.
  • Fence, carport, and garden.
  • A 10% contingency for material price changes or site conditions.

Tips to Keep Your Budget Under Control

  • Use an efficient design: a simple floor plan costs less than one with many corners and curves.
  • Fix the material specification early and put it in the RAB (itemised cost estimate).
  • Compare quotes item by item, not just the total.
  • Choose a transparent, experienced contractor—see our guide to choosing a home contractor.

One Storey or Two: Which Is Cheaper?

For the same floor area, a single-storey house is usually cheaper per m² because it doesn’t need a concrete slab, a staircase, or a heavier column-and-beam structure. In cities, however, land is often the biggest cost. Building two storeys on a smaller plot can be cheaper overall than buying a larger plot for a single-storey house.

Other considerations:

  • Long-term plans. If you may add a floor later, design the structure for it from the start (foundations and columns sized for two storeys). This is far cheaper than strengthening the structure later.
  • Who will live there. Families with elderly members may be more comfortable in a single-storey home.

Stages and Duration

Stage Work involved Typical duration
Design & permits Concept, working drawings, cost estimate, PBG 1–3 months
Substructure Excavation, foundations, ground beams 2–4 weeks
Superstructure Columns, beams, walls, slab 1–3 months
Roof Roof structure and covering 2–4 weeks
Finishing Plaster, floors, ceilings, paint, installations 1–3 months

Duration depends heavily on size, design, weather, and material availability. For a single-storey type 36–70 home, physical construction usually takes a few months.

How to Check Quality During Construction

  1. Check the reinforcement before concrete is poured: bar diameter and spacing must match the structural drawings.
  2. Make sure concrete pouring isn’t rushed, and that the concrete is cured (kept wet) for several days afterwards.
  3. Check that walls are level and square before plastering.
  4. Pressure-test the plumbing for leaks before it is covered with tiles.
  5. Photograph every stage—useful at handover and for future repairs.

Build Your Home with Inland

Inland provides house construction services from bare land to move-in ready, including house design and a detailed cost estimate. We build and renovate homes across Greater Jakarta—Jakarta, Depok, Bekasi, Bogor, Tangerang, South Tangerang, and BSD. Discuss your plans with us and get an estimate based on your design and location.

Read also: House renovation cost per square meter · Modern tropical house design · PBG requirements and process